Roofing Service
Roof Replacement & New Roofs for Homes Across the Midlands & North-East
When a roof has reached the end of its life, repairs stop being economical. A full replacement strips the old covering back, puts right whatever is underneath and gives the house a roof that is ready for decades of Irish weather rather than another winter of patching.
When a house needs a new roof
Age alone is not the deciding factor. What matters is the condition of the fixings, the felt and the timbers. Nail sickness — where the fixings corrode and slates begin slipping across the whole roof — is the usual reason a repair schedule turns into a replacement.
Perished felt, widespread cracked tiles, sagging between rafters and repeated leaks in different places all point the same way.
What a roof replacement involves
Every house is different, but a typical replacement follows the same sequence.
- Scaffold erected and the property protected before any stripping starts
- Old covering, battens and felt removed and taken away
- Timbers inspected — any rotten rafters or decayed ends repaired or replaced
- New breathable membrane and treated battens fitted
- New slates or tiles laid, with ridges, hips and verges finished properly
- New leadwork to chimneys, valleys and abutments where needed
- Roofline, guttering and downpipes checked or renewed while access is up
- Site cleared, waste removed and the finished roof walked through with you
Choosing the covering
Natural slate, fibre cement slate and concrete tile all suit Irish houses, and the right choice depends on the roof pitch, the look of the property and your budget. We will explain the practical difference between them in plain terms and quote for the option you want, not the one that suits us.
Living with the work
A re-roof is disruptive for a few days — there is no pretending otherwise. What makes it manageable is knowing what is happening and when. We agree the start date, keep the site tidy, cover what needs covering and keep you informed if weather moves things.
Questions
Roof Replacements — Common Questions
How long does a roof replacement take?
Most standard houses take roughly one to two weeks from scaffold up to scaffold down, depending on the size of the roof, the weather and the condition of the timbers underneath.
Do I need to move out during the work?
No. The house stays livable throughout. There is noise during stripping and there will be scaffolding around the property, but the roof is made watertight at the end of each working day.
Will you replace the gutters and fascia too?
It usually makes sense to, because the scaffold is already in place and the roofline is fully accessible. We will price it separately so you can decide.
Related services
Roof Repairs
Repairs for damaged, leaking or worn roofs, helping protect your home from further damage.
Read moreFascia & Soffits
Replacement and repair of damaged fascia, soffits and roofline components.
Read moreLeadwork
Professional lead flashing and leadwork repairs around chimneys, roof edges and vulnerable areas.
Read moreNeed roof replacements?
Call Crown Shield Roofing & Building on 083 072 0735 and we will talk through what your property needs.